Well I applied to SCC and was hired on. They sent me to California for my training and assignment. They were working 4 10 hr days. When i started work fridays were then made mandatory and now saturdays are mandatory. 6 10 hr days is not what I was wanting. I thought we could go site seeing on the 3 day weekend but no so we were doing it only on a normal weekend plus after doing all that walking you are tired so you do need a day of rest but now with 6 days, sunday is going to be rest only no more site seeing.
The pay and per deim is good, however you have to ask yourself do you really want to work a 48 hr physical work week? You get about 2 hrs worth of drive time and paper work per day even though you are away from the house for 10.5 hrs. Could be worse I could be looknig for a job in the hvac field which is a little slow this time of year and due to the economy.